Topaz Far East Sdn Bhd was established.
Topaz Far East Sdn Bhd changed name to Topaz Integrated Technology Sdn Bhd.
Topaz Integrated Technology Sdn Bhd office moved to Kelang Lama, Kulim, Kedah
Sungai Buluh,Selangor branch office was open to cover job in Kuala Lumpur and Southern Malaysia area.
Headquarters moved to Lunas, becomes a swicthboard factory. With about 30 employees.
Bintulu,Sarawak branch office was open in purpose to focus mainly on oil and gas servicing job in offshore in East Malaysia area.
HBAB NGV workshop was set in Lunas. This workshop main purpose is to sales ngv and servicing cars.
Topaz Oil and Gas Kemaman, Terengganu branch offices was open in order to cover job in Kerteh onshore area.
HBAB NGV workshop was rebranded as Topaz Automotive
Topaz Integrated Technology was divide to four division which is Topaz Manufacturing (Lunas HQ), Topaz Oil & Gas (Bintulu & Kemaman), Topaz Power & Utility (Sungai Buloh), and Topaz Automotive (Lunas).
Description of Work |
Date |
Client |
Oil & Gas |
||
Supply & Install Eex'd' Junction Box |
Sept 2013 |
Petronas Dagangan Berhad |
Provision of Procurement, Construction & Commissioning (PCC) of Lab Expansion & Chemical Storage Building Project For Petronas Penapisan (Melaka) Sdn Bhd (PPMSB) (HVAC Wiring) |
Sept 2013 |
Gabungan Bintang Sdn Bhd |
Provision of Plant Modification For PESD 2013 Turnaround Project (Electrical & Instrument Package) for PPMSB |
June 2013 |
HSE Resources Sdn Bhd |
MOV Local Control Panel Replacement At Area 4 (PPMSB) |
May 2013 |
RHS Tech Corporation Sdn Bhd |
Removal & Installation of New SPM Load Monitoring System At Sg. Udang Port (PPMSB) |
April 2013 |
HZN Associates (M) Sdn Bhd |
Modification of ET3 Switch Board to KCSA Load |
April 2013 |
PFCE-CG Sdn Bhd |
Spare part supply for SKO-BALINGIAN D35& Bayan Platform |
April 2013 |
BPE Engineering Sdn Bhd |
Supply manpower for health check & rectification works for heater bundle & heater control panel (HCP) at D35/Bayan/J4 |
Mar 2013 |
BPE Engineering Sdn Bhd |
SNPA SB-7703 HVAC System Switchboard -Add in Cable Gland Box C/W Bus Bar |
Mar 2013 |
Alam Dingin Air Conditioning Engineering Sdn Bhd |
To supply and install new Rittal Panel for HCP c/w Testing and Commissioning |
Dec 2012 |
MSET Engineering Sdn Bhd |
Fabrication of HVAC System Switchboard |
Dec 2012 |
Alam Dingin Air Conditioning Engineering Sdn Bhd |
Fabrication of Main Switchboard and DB |
Nov 2012 |
Accrete Technologies Sdn Bhd |
Field service for ET3 commissioning works |
Oct 2012 |
PFCE-CG Sdn. Bhd. |
Design, fabrication and supply of Main Switch Board (MSB) |
Sept 2012 |
Asaga Corporation Sdn Bhd (for Petronas) |
Design, fabrication and supply of 50kW Curing Oven |
Sept 2012 |
ElektroServe Sdn Bhd (for Petronas) |
Repair and Overhaul of Sewerage Pump Air Blower system |
Jun 2012 |
Petronas Gas Berhad |
Designed, manufactured and supplied Main Switch Board (MSB) for Temporary Power Supply for Plant Rejuvenation & Revamp (PRR2) Project |
Mar 2012 |
PFCE-CG Sdn. Bhd. |
Designed, manufactured and supplied 1200kW resistive load bank |
Oct 2011 |
Elektro Serve (M) Sdn. Bhd. |
Design, fabrication and supply of 26kW Explosion-proof Heater Control Panel |
Aug 2011 |
Integrity Engineering Services Sdn Bhd (for PetroVietnam) |
Designed, manufactured and supplied DB for Bekok-C Rejuvenation Project |
June 2011 |
PFCE-CG Sdn. Bhd. |
Design, fabrication and supply of 130kW Fuelgas Heater Control Panel |
May 2011 |
Integrity Engineering Services Sdn Bhd (for Petronas) |
Designed, manufactured and supplied DB for Owner Site Office Renovation & Contractor Temporary Facilities |
May 2011 |
PFCE-CG Sdn. Bhd. |
Designed, manufactured and supplied 2 units of 100kW fuel gas superheater control panel for Sarawak Shell Berhad St. Joseph re-development project |
Mar 2010 |
Integrity Engineering Services Sdn. Bhd. |
Troubleshoot, Rectified, and tested heater control panel at Talisman offshore platform |
Mar 2009 |
Watlow (M) Sdn. Bhd. |
Supplied foam concentrate suction hose c/w valve |
Feb 2009 |
BP PETRONAS Acetyl Sdn. Bhd. |
Designed, fabricated and supplied LV Switchboard, Annunciator panel, 280kW thyristor heater control panel, interposing relay panel and fire and gas detection system |
Feb 2009 |
MALAYSIA LNG Sdn. Bhd. |
Designed, fabricated and supplied 1 unit of 143kW fuel gas heater control panel for Kumang Cluster project |
Jan 2009 |
Petronas Carigali Sdn. Bhd. |
Designed, fabricated and supplied 4 units of 1kW fuel gas heater control panel for Kumang Cluster project |
Jan 2009 |
Petronas Carigali Sdn. Bhd. |
Designed, manufactured and supplied 280 KW Heater Control Panel |
Nov 2008 |
PFCE Dagang Sdn. Bhd. |
Troubleshoot and carried-out Hi-Pot test for heater bundle |
Nov 2008 |
Petra Fabricators Sdn. Bhd. |
Designed and supplied explosion proof fuel gas heater control panel |
Nov 2008 |
Malaysia Marine and Heavy Engineering Sdn. Bhd. |
Designed, fabricated and supplied 7.5 kW flare scrubber heater control panel |
Nov 2008 |
Talisman Energy |
Replaced heater bundle and level gauge for gas turbine online cleaning vessel |
Sept 2008 |
MALAYSIA LNG Sdn. Bhd. |
Designed, supplied and installed Intruder Alarm System for Offshore platform |
Oct 2007 |
Talisman Energy |
Tested and commissioned Super Heater Panel for Offshore platform |
June 2007 |
Watlow (M) Sdn. Bhd. |
Transportation |
||
Development of Switch Control & Actuation System for Brazil Monorail |
August 2013 |
Scomi Rail Bhd |
To Supply, install, Test and Commissioning of ESD Tables |
Sep 2012 |
Boustead Penang Shipyard Sdn Bhd |
Design, fabrication and supply of Multi-point switch beam actuator system for KL Monorail |
April 2012 |
Scomi Rail Bhd. |
Design, fabrication and supply 18 sets of multi-point switch beam actuator system for Mumbai Monorail, India |
2010 to 2012 |
Scomi Rail Bhd. |
Designed, manufactured and supplied end-wall door Monorail rolling stock for Mumbai Monorail, India |
Dec 2011 |
Scomi Rail Bhd. |
Designed, manufactured, supplied, installed, tested and commissioned Stinger Control Panel for Scomi new factory in Rawang |
Mar 2010 |
Scomi Rail Bhd. |
Designed, manufactured and supplied 60 sets of Auxiliary Power Supply Enclosure |
Mac 2010 |
Scomi Rail Bhd. |
Designed, manufactured and supplied 60 sets of 750VDC Distribution Panel Traction Enclosure |
Jan 2010 |
Scomi Rail Bhd. |
Design and development of multi-point switch beam actuator system |
Dec 2009 |
Scomi Rail Bhd. |
Designed, manufactured, supplied, installed, tested and commissioned Hydraulic and Electrical Control System for the Prototype 3 Point Switch |
Mac 2009 |
Scomi Rail Bhd. |
Semiconductor & Manufacturing |
||
Design & fabrication of Ultrasonic cleaning machine |
Dec 2013 |
JWR Technology Sdn Bhd |
Supply manpower for waste water treatment monitoring system at Panasonic Energy factory |
June 2013 |
Techtral Engineering Sdn Bhd |
To Supply and install of heater Jacket Hook-Up for Tool ID:F1PGAM02 |
April 2013 |
Silterra Sdn Bhd |
HPM Detection System I1LEVA04 |
Feb 2013 |
Silterra Sdn Bhd |
To supply manpower & tools for panel modification work |
Nov 2012 |
Schaefer Kalk (M) Sdn Bhd |
To Supply and Install Pump Network Cables |
Sep 2012 |
Kinetics Systems (M) Sdn Bhd |
To supply labour, parts and tools for race track conveyer maintainance at rapiscan curve conveyor production assembly line |
Aug 2012 |
Rapiscan Systems Sdn Bhd |
Design, fabrication, installation, testing and commissioning of IPA Bottle Refilling Station |
May 2012 |
Silterra Sdn Bhd |
Fabrication, testing and installation of Main switchboard (MSB) |
Mar 2012 |
Permintex Electronic Sdn Bhd |
Design, fabrication, installation, testing and commissioning of CMP Drain Diverter system |
July 2011 |
Silterra Sdn Bhd |
Design, fabrication, installation, testing and commissioning of Motor Speed Detection system |
May 2011 |
Silterra Sdn Bhd |
Supply, install and test signal cable for Compress Dry Air (CDA) Online Monitoring |
Mar 2010 |
Q-Cells Malaysia Sdn. Bhd. |
Designed, manufactured, installed, tested and commissioned LPG storage monitoring system |
Feb 2010 |
Q-Cells Malaysia Sdn. Bhd. |
Designed, manufactured and supplied electrical control panel and pneumatic valve panel |
Oct 2009 |
Schaefer Kalk (Malaysia) Sdn. Bhd. |
Supplied and installed temperature control panel, heating & insulation tape |
Mar 2009 |
UCT Engineering (M) Sdn. Bhd. |
Supplied and installed cable for O2 Gas sensor control panel including 2 nos Rotary light (red & green) and 2 nos 24 VDC relay |
Nov 2008 |
Silterra (M) Sdn. Bhd. |
Designed, manufactured and installed MCC panel |
May 2007 |
Toray Plastic Sdn. Bhd. |
Supplied and installed instrumentation and communication control panel for Toray Plastic (M) Sdn. Bhd. |
April 2007 |
Toray Engineering |
Supplied and installed Control Wiring for Gas Cabinet and VMB |
Mar 2006 |
Silterra (M) Sdn. Bhd. |
Designed, supplied and installed heater jacket for Silterra process tools |
June 2006 |
Silterra (M) Sdn. Bhd. |
Supplied and installed heat tracing for Infineon process tools |
Feb 2006 |
Kinetics Germany GmBh. |
Supplied and installed various M&E works for Infineon Kulim Technology |
Jan 2006 |
Infineon Technologies Sdn. Bhd. |
Designed and installed Heater Jacket and Temperature Control System for Silterra Abatement For Line and Exhaust Line |
Sept 2005 |
Watlow (M) Sdn. Bhd. |
Designed and installed Heat Tracing control system for C2F6 and N2O gas piping at Silterra |
Aug 2005 |
Silterra (M) Sdn. Bhd. |
Supplied Instrumentation and Communication Control Panel for Penfibre Film Division |
July 2005 |
Rosek (M) Sdn. Bhd. |
Supplied motorcycle engine firing control system for Modenas |
Jan 2005 |
Motosikal dan Enjin National Sdn. Bhd. (MODENAS) |
Supplied control system for scrubber exhaust at Silterra |
Aug 2004 |
Hexagon Tower Sdn. Bhd. |
Designed and fabricated crankcase bearing pressing machine |
June 2004 |
Motosikal dan Enjin National Sdn. Bhd. (MODENAS) |
Utilities & Facilities |
||
Design & fabrication of Feeder Pillar |
Nov, Dev 2013 |
Seroja, EMC Teguh |
Supply, Delivery, Installation & Testing of SCADA Interface Facilities and Plant Interfacing Work for Low Voltage Circuit Breaker (LVCB) in Main Intake (PMU) |
May 2013 |
Tenaga Nasional Berhad |
Fabrication of HVAC MCC panels for TNB Janamanjung power plant |
August 2013 |
Lead Management Engineering (M) Sdn Bhd |
To supply SCC Rud Chain, Chain Coupling and Toothed Drive Sprocket, at stesen Janakuasa Sultan Azlan Shah, TNB Janamanjung Sdn Bhd |
Dec 2012 |
TNB Jana Manjung |
Servicing, testing and commissioning works for Electrical distribution, controls and instrumentation for NUR Power Plant Kulim |
Jun - Nov 2012 |
Weir Engineering Services Ltd |
Supply, Delivery, Installation & Testing of SCADA Interface Facilities and Plant Interfacing Work for Low Voltage Circuit Breaker (LVCB) in Main Intake (PMU) |
2012 |
Tenaga Nasional Berhad |
Supply, Delivery, Installation & Testing of SCADA Interface Facilities and Plant Interfacing Work for Primary and Secondary Substations in Southern Region - SCADA Phase 2 Project |
2012 |
Tenaga Nasional Berhad |
Designed, manufactured and supplied 1500A MSB and sub-DB for factory in Bukit Beruntung, Selangor |
Sept 2011 |
Elektro Serve (M) Sdn. Bhd. |
M&E work at new switch deck in Scomi Rawang |
Nov 2009 |
Nam Fatt Fabricators Sdn. Bhd. |
Designed, manufactured, installed, tested and commissioned MCC Panel for sewerage treatment plant, IWK Simpang Kuala, Alor Setar |
Nov 2009 |
BJN Engineering Sdn. Bhd. |
Designed, manufactured and supplied electrical control panel for water treatment system |
Oct 2009 |
Rossington Consolidated Sdn. Bhd. |
Manufactured and supplied V-groove roller bearing |
Apr 2009 |
Rapiscan Systems Pte. Ltd. |
Installed instrument, cabling and interfacing program for KUALITI ALAM Modular Incinerator for Yamatake Automation (M) Sdn. Bhd. |
Jan 2009 |
Kualiti Alam Sdn. Bhd. |
Designed, manufactured and supplied electrical switchboard and control system for Pinang Tunggal pump house |
Dec 2008 |
Jabatan Parit dan Saliran (JPS) |
Designed, supplied, installed, tested and commissioned Building Automation System for PETRONAS building in Kerteh |
Nov 2008 |
Petronas Carigali Sdn. Bhd. |
Supplied and delivered fire hose to port safety department |
Oct 2008 |
Johor Port Berhad |
Supplied and installed 6” exhaust fan c/w accessories |
June 2008 |
Magna Prima Berhad |
Supplied M-System linearizer (field programmable) for GDC KLIA |
April 2008 |
Makhostia Sdn. Bhd. |
Troubleshoot, repaired and replaced the faulty components of touch screen panel for GDC Putrajaya |
April 2008 |
Makhostia Sdn. Bhd. |
Supplied Digitronik digital indicating controller for GDC KLIA |
Feb 2008 |
Makhostia Sdn. Bhd. |
Supplied and installed touch screen panel for GDC Putrajaya |
Jan 2008 |
Makhostia Sdn. Bhd. |
Replaced, tested and commissioned syncro check relay for 11KV incoming supply gas district cooling plant |
Dec 2007 |
University Teknologi Petronas |
Supplied and installed touch screen panel for chiller |
July 2007 |
Makhostia Sdn. Bhd. |
Supplied and installed HVAC control wiring for Infineon office building |
Dec 2005 |
Principle Perspective Engineering Sdn. Bhd. |
Designed and fabricated HVAC control system for deployment in US Navy Ships |
Sept 2004 |
Optosensor (M) Sdn. Bhd. |
Designed and fabricated heavy duty scissor jack for US Navy X-Ray machine |
Sept 2004 |
Optosensor (M) Sdn. Bhd. |
Supplied and installed communication tower for DiGi |
April 2004 |
Tanjung Serbanika Sdn. Bhd. |
Designed and fabricated truck pulling facility |
Mac 2004 |
Optosensor (M) Sdn. Bhd. |
Supplied and installed IT infrastructure at MSI workshop and administration building |
Jan 2003 |
Kulim Technology Management Sdn. Bhd. |
Institution of Higher Education |
||
Design, fabrication and testing of Hydro-static Cyclic Pressure Tester |
May 2012 |
SIRIM Berhad |
Design, fabrication, installation, testing and commissioning of Flammable Gas Detection & Alarm system |
July 2011 |
UiTM Permatang Pauh |
Designed and fabricated chilled water control valve spool pipe with control valve |
Jan 2008 |
University Teknologi Petronas |
Designed, supplied and installed Lab Equipment Local Exhaust Control System |
Jan 2007 |
USM Penang |